(Cost)
(Production)
Line 227: Line 227:
 
===Production===
 
===Production===
  
Vuotuinen polttoaineen kulutus tulee olemaan noin 4 TWh riippuen vuodesta sekä laitoksen ajotavasta.<ref name="yva"/> Uuden voimalaitoksen kaukolämpöteho olisi noin 350 MW ja sähköteho noin 200 MW. <ref>[https://www.helen.fi/kotitalouksille/neuvoa-ja-tietoa/vastuullisuus/hiilineutraali-tulevaisuus/puupolttoaineet/ Helsingin Energia]</ref>
+
The annual fuel consumption will be approximately 4 TWh depending on the year and the way the plant is run.<ref name="yva"/> The new plant's district heat output would be around 350 MW and electricity output 200 MW.<ref>[https://www.helen.fi/kotitalouksille/neuvoa-ja-tietoa/vastuullisuus/hiilineutraali-tulevaisuus/puupolttoaineet/ Helsingin Energia]</ref>
  
Noin 40–50 % lämmöstä siirtyy tulipesässä tulipesän seiniin ja mahdolliseen tulipesätulistimeen. Loppu lämpö siirretään konvektio-osassa.<ref name="yva"/>
+
Around 40-50 % of the heat is conducted to the furnaces' walls and the possible superheater. The rest of the heat is transferred in the convection part.<ref name="yva"/>
  
 
===Effects to Natura 2000 area===
 
===Effects to Natura 2000 area===

Revision as of 11:53, 11 June 2015


BAU

In Business as usual -option coal remains the main fuel in Hanasaari B and Salmisaari B power plants, but the use of biofuels is increased to 5−10 % and the changes to power plants required in the new Industrial Emission Directive (IED) are made. These changes have already been approved and some are already done, so they will happen no matter what is decided about the rest of the options.

The IED sets new emission limit values (ELVs) to power plants within the European Union, which will be in effect as of 1.1.2016. In order to stay within the new ELVs, both Hanasaari and Salmisaari power plants must be renovated.[1]

The changes to be made in Hanasaari are:[1]

  • Enhancing sulphur removal
  • Selective catalytic reduction (SCR) or selective non-catalytic reduction (SNCR), or polttotekniset ratkaisut (combustion-technical solutions???)
  • Renewing the electric filters or enhancing their operation

The changes to be made in Salmisaari are:[1]

  • Enhancing sulphur removal
  • Selective catalytic reduction (SCR) or selective non-catalytic reduction (SNCR), or polttotekniset ratkaisut (combustion-technical solutions???)
  • Renewing the electric filters or enhancing their operation

Emissions

Error creating thumbnail: Unable to save thumbnail to destination
An example of a dispersion(?) model's results on a map. Particulate matter (PM10) fallout from Hanasaari and Salmisaari power plants in BAU.

Hanasaari receives a maximum of 11 pellet deliveries per day and Salmisaari max 14/d.[1]

The amount of by-products of Hanasaari and Salmisaari power plants in BAU.[1]
Option Fly ash (t/a) Bottom ash (t/a) Sulphur-removal end product (t/a) Total (t/a)
Hanasaari power plant: biofuels 10 % 59 000 12 000 8 000 79 000
Salmisaari power plant: biofiels 10 % 45 000 11 000 9 000 65 000
Total 104 000 23 000 17 000 144 000
Emissions in BAU. Hanasaari and Salmisaari both 95 % coal, 5 % bio[1]
Emission source CO2 kt/a CO2-eqv kt/a (incl. fossil fuel ghg-emissions) CO2-eqv kt/a (incl. fossil and biofuel emissions)
Power plant emissions 2 524 2 533 2 687
Emissions from fuel transport 8
Total 2 540 2 700
Emissions from Salmisaari burning ~7% biofuels.[1]
Power plant NO2 (t/a) SO2 (t/a) Particles (t/a)
Salmisaari A and B 946 996 92
Computational amounts of combustion by-products of Salmisaari powerplants.[1]
Fly ash (t) Bottom ash (t) Sulphur removal end product (t) Total (t)
Salmisaari power plants: 10 % bio, 90 % coal 45 000 11 000 9 000 65 000

Emission coefficients

Cost

No building cost, because nothing is renovated nor built.

Usage cost

Production

How much energy?

Electricity MW Heat MW Fuel
Hanasaari 220 420 coal, pellets
Salmisaari 160 300 coal, pellets
Total 380 720

Same table as in VE2(?), because same power plants will be in use.

Vuosaari

A new power plant is built in Vuosaari. The new plant (Vuosaari C) can burn any ratio of biofuel to coal. An energy tunnel is built from Vuosaari to Hanasaari to transport the energy to Helsinki city center.

Effects:

  • Emissions
  • Cost
  • Traffic
  • Noise (Natura 2000 -area nearby)
  • Air quality
  • Forests close by and further away in Finland
  • Drawing closer to the coal-neutrality goal
  • Running level
  • Jobs in construction
  • Decision-maker: Helsinki city, Helen

Description

The plans for power plant Vuosaari C are based on the assumption, that the plant will mostly use biofuels (max 80%) and coal (20%). The planned fuels are wood chips and pellets as well as small amounts of agro-biomass. The use of biochar is also possible. The plant will be fitted with a boiler developed for biofuel combustion (specifically kiertoleijupetikattila ). In order to ensure stable levels of district heat the plant is planned so, that it can function using coal only. Nevertheless plans can be made to enable the use 100 % biofuels. The recent Environmental Impact Assessment (EIA) compared the options of burning 1005 biofuels with the extreme option of burning 100 5 coal.[1]

Three options are considered for the Vuosaari powerplant (in this option, Salmisaari always burns 95% coal and 5% biofuels):

  • V1: 80% biofuels, 20% coal
  • V2: 100% biomass
  • V3: 100% coal

At the same time Helsinki is planning a 12 kilometres long energy tunnel from Vuosaari to Hanasaari. It would be quarried in bedrock and provide district heating and possibly electricity for the needs of the whole city. The warehouses for fuel, locations for unloading trains and trucks and conveyor would be built next to the plant, and possibly a road for crossing the train tracks as well.[1]

Error creating thumbnail: Unable to save thumbnail to destination
Possible map for the new Vuosaari power plant area. The coal storage area (brown) might also be located in the other side of the train tracks.[1]
Error creating thumbnail: Unable to save thumbnail to destination
The planned energy tunnel from Vuosaari to Hanasaari.[1]

Emissions

Error creating thumbnail: Unable to save thumbnail to destination
An example of the dispersion(?) model's results on a map. Particulate matter (PM10) fallout from Vuosaari and Salmisaari power plants in option Vuosaari.[1]
Error creating thumbnail: Unable to save thumbnail to destination
Annual nitrate fallout of the Vuosaari A, B and the new C power plant combined.[1]
Error creating thumbnail: Unable to save thumbnail to destination
Annual sulphur fallout of the Vuosaari A, B and the new C power plant combined.[1]

The emissions from the new plant would have two main sources: combustion of biofuels and coal and from transporting those fuels to Vuosaari C.

The fuel will be brought to the plant by ship, barge, train and truck. Ships and barges will be used to transport biofuel, coal and oil. Trains and trucks will mainly be used for transporting biofuels, trains also for transporting coal. Because the amounts of fuel required by the C-plant will be substantial, the fuel shipments will mostly be carried out using ships. Trains and trucks will be a supplementary means of transport. Shipments can be brought 24/7.[1]

Flue gases will be conducted to flue gas purification, where the particles are remowed, after which the flue gases are directed through flue gas blowers into the chimney. The ashes from the fuel are remowed as bottom ash from the furnace and as fly ash in the flue gas purification.

The power plant's flue gases are purified efficiently, so harmful effects to nearby vegetation remain slight. The great height of the chimney aids in the effective dilution of emissions in the air, so the effects on local concentrations are minimized. Judging by the atmospheric fate and transport (AFT) modeling's calculations, the new power plant C would cause only a minimal increase in air impurity levels in the metropolitan area. It is estimated that the fallout wont have harmful impacts on the vegetation of Natura-areas in Östersundom bird waters and Mustavuori grove nor further away north-east in Sipoonkorpi's Natura-area.[1]

Judging by the AFT-modeling's results, the nitrogen oxide-, sulfur oxide- or particulate matter emissions from the normal operation of Helsingin Energia's powerplants do not cause a health risk to the residents in the neighbouring area. In each Vuosaari option the plants' emission levels are lower than the recommended values and limit values for air quality, which have been decreed in order to protect health. In evaluating the results of the AFT-modeling it needs to be considered, that the enviromental impact assessment (EIA) did not review the plants' possible emissions in a fault situation or the combined impact on air quality of the plants and other sources of emissions in te area.[1]

Emissions from Vuosaari power plants.[1]
Power plant NO2 (t/a) SO2 (t/a) Particles (t/a)
Vuosaari C 853 853 57
Vuosaari A and B 550 - -
Total 2 349 1 849 149


Computational amounts of combustion by-products of different fuel ratios in Vuosaari sub-option.[1]
Sub-option Fly ash (t) Bottom ash (t) Sulphur removal end product (t) Total (t)
V1 80 % bio, 20 % coal 59 000 10 000 - 69 000
V2 100 % bio (10 % pellet, 90 % chips) 52 000 9 800 - 62 000
V3 100 % coal 82 000 52 000 - 134 000


Emissions for Vuosaari, for different sub-options.[1]
CO2, kt/a CO2-ekv, kt/a (incl. fossilfuel ghg emissions) CO2-ekv, kt/a (incl. fossilfuel and biofuel emissions)
V1 powerplant emissions 1 468 1 402 3 061
V2 powerplant emissions 1 073 1 114 3 090
V3 powerplant emissions 2 722 2 882 2 947
V1 fuel transport emissions 15
V2 fuel transport emissions 23
V3 fuel transport emissions 6
V1 total emissions 1 480 3 080
V2 total emissions 1 140 3 110
V3 total emissions 2 890 2 950

Cost

Building cost

The recent Environmental Impact Assessment takes a quick look at the different energy investment options' economic effects. A project plan will made later in 2015 and give more precise details on the economic effects. Building the new power plant would probably be twice as expensive as making the necessary changes in the old plants. Assessing the economic effects is not simple, however. Using the Vuosaari C plant would be tens of millions cheaper yearly than using the overhauled Hanasaari and Salmisaari plants. The city of Helsinki will lose money also if they can not build a new residential area in Hanasaari as planned.[2]

The power plant itself will cost approximately 650 million euros and the energy tunnel 180 million euros. An estimate (2011) of the total costs is 1,2 billion.[3]

Usage cost

If the Vuosaari C powerplant uses 100 % biofuels (ratio: 90 % wood chips to 10 % pellets), it would mean an annual fuel amount of 1,8 million tons wood chips and 103 000 tons pellets.

If the portion of biofuels is 80 % (ratio: 90 % wood chips to 10 % pellets), it would mean an annual fuel amount of 1,46 million tons wood chips, 82 000 tons pellets and 140 000 tons coal.

If the Vuosaari C powerplant uses coal only, it would need 660 000 tons of it per year.[1]

The export price on wood pellets is 133 €/t [1].

The price of wood chips is 20€/MWh? [2][3]

According to this page, the thermal coal CAPP price is about 50 €/metric tonne.

Fuel consumption in Vuosaari C[1]
Coal Wood chips Wood pellet
Fuel consumption t/h 0–108 0–334 0–178
Fuel consumption m3/h 0–135 0–1 113 0–255

Calculations:

If 100% coal is used in Vuosaari power plant

660 000 t/a * 50 €/t = 33 000 000 €/a

If only 20% coal was used:

coal: 140 000 t/a * 50€/t = 7 000 000 €/a
pellets: 82 000 t/a * 133 €/t = 10 906 000 €/t
hake: 1 460 000 t/a * €/t =

If only biofuels were used:

hake: 1 800 000 t/a * €/t =
pellets: 103 000 t/a * 133 €/t = 13 699 000 €/a

Production

The annual fuel consumption will be approximately 4 TWh depending on the year and the way the plant is run.[1] The new plant's district heat output would be around 350 MW and electricity output 200 MW.[4]

Around 40-50 % of the heat is conducted to the furnaces' walls and the possible superheater. The rest of the heat is transferred in the convection part.[1]

Effects to Natura 2000 area

Vallitseva tuulensuunta on lounaasta. Sataman melumuuri ja ennen kaikkea Niinisaaren metsäinen vyöhyke rajoittavat päästöjen leviämistä koilliseen ja mm. Natura-alueelle. Kasvillisuus sitoo pölyä erityisesti kesäaikaan.[1]

Hanasaari shutdown

Hanasaari power plant is shut down and demolished. Apartment buildings are constructed in its place.

Effects:

  • Emissions
  • Cost
  • Land use near city center
  • Market rates for apartments in Helsinki
  • Quality of inner city environment
  • Running level
  • Jobs in construction
  • Decision-maker: Helsinki city, Helen

Emissions

Ei päästöjä?

Cost

Hyöty?

Hanasaari 40 biofuel

Hanasaari power plant is renovated to burn 40% biofuels among coal.

Effects:

  • Emissions
  • Cost
  • Forests around Finland
  • Running level
  • Economy of cities selling biofuels
  • Jobs in construction
  • Decision-maker: Helsinki city, Helen
Error creating thumbnail: Unable to save thumbnail to destination
What Hanasaari would look like in option Hanasaari 40 biofuel.[1]

Emissions

Hanasaaren voimalaitokselle pelletti tuodaan pääasiassa laivoilla. On arvioitu, että Hanasaareen tulisi noin 18 autokuljetusta pellettiä vuorokaudessa. Hanasaareen on vuodessa arvioitu tulevan yhteensä noin 100 alusta, joka sisältää sekä pelletti- että kivihiilikuljetukset.[1]

The flue gas emissions in Hanasaari when is burns 40% biofuels.[1]
NO2 (t/a) SO2 (t/a) Particles (t/a)
Hanasaari B 1 224 1 224 122
Hanasaaren voimalaitoksiella vuodessa syntyvät sivutuotemäärät kun se polttaa 40% biofuels.[1]
Lentotuhka (t/a) Pohjatuhka (t/a) Rikinpoiston lopputuote (t/a) Yhteensä (t/a)
Hanasaari power plant: 40 % biofuels, 60 % coal 40 000 9 000 6 000 54 000
Emissions for Hanasaari 40% biofuels + Salmisaari 40% biofuels.[1]
CO2, kt/a CO2-eqv, kt/a (incl. fossilfuel ghg-emissions) CO2-ekv, kt/a (incl. fossilfuel and biofuel emissions)
Power plant emissions 1 594 1 606 2 837
Fuel transport emissions 11
Total 1 620 2 850

Emission coefficients

Cost

Building cost

Pelkkä voimalaitos noin 100 miljoonaa, kokonaisvaikutus Helsingin Energian investointikustannuksiin 500 miljoonaa (arvio vuodelta 2011).[3]

Usage cost

Vaihtoehdossa Hanasaari 40 % biopolttoaineita käytetään noin 390 000 tonnia kivihiiltä vuodessa ja pellettiä noin 380 000 tonnia. Tuki- ja varapolttoaineena öljyä arviolta 11 500 tonnia vuodessa.[1]

Production

Energy production in Hanasaari. [5]
Electricity MW Heat MW Fuel
Hanasaari 220 420 coal, pellets

Salmisaari 40 biofuel

Salmisaari power plant is renovated to burn 40% biofuels among coal.

Effects:

  • Emissions
  • Cost
  • Forests around Finland
  • Running level
  • Economy of cities selling biofuels
  • Jobs in construction
  • Decision-maker: Helsinki city, Helen
Error creating thumbnail: Unable to save thumbnail to destination
What Salmisaari would look like in option Salmisaari 40 biofuel.[1]

Kuvaus

Salmisaaren voimalaitokselle pelletit tulevat autokuljetuksilla. On arvioitu, että Salmisaareen tulisi noin 53 autokuljetusta pellettiä vuorokaudessa. Helsingin Energia selvittää myös kuljetusvaihtoehtoa, jossa Salmisaaressa käytettäviä pellettejä tuotaisiin myös Hanasaaren sataman kautta. Jos kaikki Salmisaaressa käytettävät pelletit kuljetettaisiin Hanasaaren kautta, sen satamaan kulkisi vuosittain noin 90 pelletti- ja kivihiilialusta enemmän, kuin muutoin.[1]

Päästöt

Flue gas emissions for Salmisaari 40% biofuels.[1]
Power plant unit NO2 (t/a) SO2 (t/a) Particles (t/a)
Salmisaari A and B 946 996 92
Salmisaaren voimalaitoksilla vuodessa syntyvät sivutuotemäärät 40% biopolttoaineosuudella[1]
Lentotuhka (t/a) Pohjatuhka (t/a) Rikinpoiston lopputuote (t/a) Yhteensä (t/a)
Salmisaari power plant: 40 % biofuels, 60 % coal 30 000 8 000 6 000 44 000
Päästöt vaihtoehdossa Hanasaari 40 + Salmisaari 40.[1]
CO2, kt/a CO2-eqv, kt/a (incl. fossilfuel ghg-emissions) CO2-ekv, kt/a (incl. fossilfuel and biofuel emissions)
Power plant emissions 1 594 1 606 2 837
Fuel transport emissions 11
Total 1 620 2 850

Salmisaaressa käytetään kivihiiltä noin 290 000 tonnia vuodessa ja pellettiä noin 280 000 tonnia. tuki- ja varapolttoaineena öljyä arviolta 11 500 tonnia vuodessa.[1]

Electricity MW Heat MW Fuel
Salmisaari 160 300 coal, pellets

Cost

Production

Loviisa nuclear CHP

A new nuclear power plant is built in Loviisa and used for district heating in Helsinki.

Effects:

  • Emissions
  • Cost
  • Nuclear waste
  • Perceived safety
  • Running level
  • Jobs in construction
  • Decision-maker: Helsinki city, Fortum, Loviisa city?

Neste excess heat

Excess heat from Neste's oil refinery in Porvoo is used for district heating in Helsinki.

Effects:

  • Cost
  • Running level
  • Jobs in construction
  • Decision-maker: Helsinki city, Neste

Decentralised energy production

Small-scale energy production units are built around Helsinki, such as heat pumps, geothermal and sun panels, for producing energy for a single building.

Effects:

  • Emissions
  • Cost
  • Running level
  • Tourism & Finland's imago
  • Jobs in construction
  • Jobs in research?
  • Decision-maker: Helsinki city, Citizens

Large heat pumps

Heat pumps are installed to draw large amounts of heat from the Gulf of Finland (similar system as in Stockholm) or from deep drilled hole from the ground (similar system as piloted in Espoo).

Effects:

  • Emissions
  • Cost
  • Baltic sea
  • Running level
  • Environmental and political concerns
  • Tourism & Finland's imago
  • Jobs in construction
  • Decision-maker: Helsinki city

Energy saving

Buildings in Helsinki are renovated, big campaigns to affect attitudes are organised and zero-energy houses are built to reduce the consumption of power significantly.

Effects:

  • Emissions
  • Cost
  • Tourism & Finland's imago
  • Running level
  • Jobs in construction
  • Decicion-maker: Helsinki city, Citizens

See also

Helsinki energy decision 2015
In English
Assessment Main page | Helsinki energy decision options 2015
Helsinki data Building stock in Helsinki | Helsinki energy production | Helsinki energy consumption | Energy use of buildings | Emission factors for burning processes | Prices of fuels in heat production | External cost
Models Building model | Energy balance | Health impact assessment | Economic impacts
Related assessments Climate change policies in Helsinki | Climate change policies and health in Kuopio | Climate change policies in Basel
In Finnish
Yhteenveto Helsingin energiapäätös 2015 | Helsingin energiapäätöksen vaihtoehdot 2015 | Helsingin energiapäätökseen liittyviä arvoja | Helsingin energiapäätös 2015.pptx

References