Difference between revisions of "Conclusion"
From Testiwiki
Juha Villman (talk | contribs) |
Juha Villman (talk | contribs) m |
||
Line 1: | Line 1: | ||
− | [[Category:Glossary term]] | + | [[Category:Glossary term]]<section begin=glossary /> |
− | <section begin=glossary /> | + | :Conclusion of a risk [[Assessment|assessment]] refers to an arrangement or agreement that introduces either a changed state of affairs or verifies business as usual (BAU) as a best option for the assessment scope. The (new) verified state of affairs is likely to last for some time.<section end=glossary /> |
− | Conclusion of a risk [[Assessment|assessment]] refers to an arrangement or agreement that introduces either a changed state of affairs or verifies business as usual (BAU) as a best option for the assessment scope. The (new) verified state of affairs is likely to last for some time.<section end=glossary /> |
Revision as of 10:41, 28 April 2008
<section begin=glossary />
- Conclusion of a risk assessment refers to an arrangement or agreement that introduces either a changed state of affairs or verifies business as usual (BAU) as a best option for the assessment scope. The (new) verified state of affairs is likely to last for some time.<section end=glossary />