Difference between revisions of "Hämeenkyrö MSWI risk assessment: Miscellanous"

From Testiwiki
Jump to: navigation, search
(Existing MSWI plants and current plans in southern Finland: Discussion link created)
(Existing MSWI plants and current plans in southern Finland)
Line 85: Line 85:
 
{{var  
 
{{var  
 
|Name        = Existing MSWI plants and current plans in southern Finland {{Disclink|Existing MSWI plants and current plans in southern Finland}}
 
|Name        = Existing MSWI plants and current plans in southern Finland {{Disclink|Existing MSWI plants and current plans in southern Finland}}
|Focus      = Existing MSWI plants and current plans in southern Finland  
+
|Focus      = Existing MSWI plants and current plans in southern Finland {{Disclink|Existing MSWI plants and current plans in southern Finland}}{{Disclink|Existing MSWI plants and current plans in southern Finland}}
 
|Scope      = Existing and planned MSWI plants that could be optional for Hämeenkyrö MSWI (maximum distance of 250 km) Option 0 in the environmental impact assessment for Hämeenkyrö MSWI was not to build the plant but transport the waste to be burned elsewhere or landfilled.  
 
|Scope      = Existing and planned MSWI plants that could be optional for Hämeenkyrö MSWI (maximum distance of 250 km) Option 0 in the environmental impact assessment for Hämeenkyrö MSWI was not to build the plant but transport the waste to be burned elsewhere or landfilled.  
 
Existing MSWI plant (capacity 50 000 t/a) is in Turku (since 1975), and more burning capacity is planned there for 150 000 t/a. MSWI plants in the future In Riihimäki the construction of 150 000 t/a plant has already begun and further away in Kotka there is environmental permit for an 80 000-100 000 t/a plant. Environmental permits were complaint about in Lahti, Kerava and Pori and interrupted project for a while. In Jyväskylä and Seinäjoki environmental impact assessments has been done. Also Helsinki Metropolitan Area Council (YTV) has decided to start planning a new MSWI plant, decisions about position, capacity and technique will be made in the near future.  
 
Existing MSWI plant (capacity 50 000 t/a) is in Turku (since 1975), and more burning capacity is planned there for 150 000 t/a. MSWI plants in the future In Riihimäki the construction of 150 000 t/a plant has already begun and further away in Kotka there is environmental permit for an 80 000-100 000 t/a plant. Environmental permits were complaint about in Lahti, Kerava and Pori and interrupted project for a while. In Jyväskylä and Seinäjoki environmental impact assessments has been done. Also Helsinki Metropolitan Area Council (YTV) has decided to start planning a new MSWI plant, decisions about position, capacity and technique will be made in the near future.  

Revision as of 07:52, 22 September 2006

See the main page of this assessment: Risk assessment on Hämeenkyrö municipal solid waste incinerator

  • Secondary effects on waste separation, recycling etc.)


Municipal solid waste production in Häme

Pasi K

Existing MSWI plants and current plans in southern Finland

Marjaleena

Background of waste production and its relations to EU directive

Eva