Energy balance of electric power in the Nord Pool area
From Testiwiki
Revision as of 11:21, 27 November 2015 by Jouni (talk | contribs) (first draft based on ideas developed in Helsinki energy decision 2015)
This page is a assessment.
The page identifier is Op_en7415 |
---|
Moderator:Jouni (see all) |
Give your opinion to the peer rating of the content of this page. |
Upload data
|
Contents
Question
What possibilities are there to develop electric power supply and demand in such a way that
- the supply always covers the demand,
- the overall system is cost-effective, and
- the overall system has as low carbon dioxide emissions as possible?
Intended use and users
These organisations are hoped to use the information produced:
- Työ- ja elinkeinoministeriö, Finland
- The Ministry of Environment (Ympäristöministeriö), Finland
The work aims to help these strategic planning processes:
- Energia- ja ilmastostrategia (to be finalised by Dec 2016)
- Keskipitkän aikavälin ilmastopoliittinen suunnitelma (to be finalised by May 2017)
Participants
- THL
- Uusi energiapolitiikka Group (in Facebook)
Boundaries
Decisions and scenarios
Timing
The assessment will hopefully be performed during spring 2016. There are no funding or resources yet.
Answer
Results
Conclusions
Rationale
Error creating thumbnail: Unable to save thumbnail to destination
Stakeholders
Dependencies
- en:Nord Pool Spot Download Center
- State of the Nordic power system
- ELFI ry: Nordic electric power market
- Fortum Energy Review 2015 [1]
- Energiauutiset 11.11.2015: Toimintasuunnitelma teho-ongelmien helpottamiseksi
Analyses
Indices
Calculations
See also
Keywords
References