Difference between revisions of "Reporting an assessment"
From Testiwiki
(moved from Heande) |
Juha Villman (talk | contribs) |
||
Line 1: | Line 1: | ||
− | <accesscontrol>members of projects</accesscontrol> | + | <accesscontrol>members of projects,,Workshop2008,,beneris,,Erac,,Heimtsa,,Hiwate,,Intarese</accesscontrol> |
{{method}} | {{method}} | ||
Revision as of 14:00, 19 February 2008
<accesscontrol>members of projects,,Workshop2008,,beneris,,Erac,,Heimtsa,,Hiwate,,Intarese</accesscontrol>
This page is a method.
The page identifier is Op_en1991 |
---|
Moderator:Nobody (see all) Click here to sign up. |
Give your opinion to the peer rating of the content of this page. |
Upload data
|
Summary
Contents
Purpose
In this phase the information created in the assessment is compiled and conveyed to the intended users.
Structure of the process
Input format
Procedure
- Interpretation
- Communication with users & stakeholders
- Evaluation
- Documentation & presentation
Management
Output format
The outcome of this phase, and thus also the outcome of the whole assessment, becomes realized in the form of an assessment report that concludes the major findings of the assessment. It could contain e.g. the following parts:
- Name of the risk assessment
- Scope: Purpose, Boundaries, Scenarios, Optimizing, Analyses, Intended users, Participation in the assessment
- Variables (set of variables included): Decision variables, Outcomes of interest (=indicators), Other variables
- Results of indicator variables, other selected variables, assessment-specific analyses
- Conclusions on indicators given scope
- Summary